Custom patch supplier and project coordination partner in China

Custom patches for brands, teams and merchandise

Samples and MOQ for Custom Patches

The standard minimum order quantity is 50 pieces for embroidered patches and 100 pieces for most other patch types. Physical samples are available with a sample fee, and the final sample cost depends on design, size, colors, material and production requirements.

Samples and MOQ for Custom Patches
Material reference

Standard MOQ

Embroidered patches usually start from 50 pieces. Most other patch types usually start from 100 pieces. Final requirements may depend on design, size, material and production requirements.

Physical Samples

Physical samples are available with a sample fee. The fee depends on artwork, finished size, number of colors, material, backing and border requirements.

Digital Proof Timing

A digital proof is usually prepared within approximately 3-4 days after order details and artwork requirements are confirmed.

What Affects Final Requirements

Patch type, finished size, quantity, design complexity, backing, border, sample requirements and shipping destination can all affect quotation and timing.

FAQ

Common Buyer Questions

Answers below use only confirmed Heypal Patch order information: standard MOQ, paid samples, proof approval, PayPal payment, shipment photos and international shipping coordination from China.

  • 50-piece MOQ for embroidered patches
  • 100-piece MOQ for most other patch types
  • Digital proof before bulk production
  • PayPal payment for confirmed orders
What is the minimum order quantity?

The standard MOQ is 50 pieces for embroidered patches and 100 pieces for most other patch types. Final requirements may depend on the design, size and production method.

Do you provide physical samples?

Yes. Physical samples are available with a sample fee. The fee depends on the artwork, size, number of colors, material and production requirements.

How long does a digital proof take?

A digital proof is usually prepared within approximately 3-4 days after the order information and artwork requirements are confirmed.

How long does bulk production take?

Bulk production usually takes approximately 8-10 days after the customer approves the digital proof. Timing may vary depending on the patch type, quantity and artwork complexity.

Will I approve the design before production?

Yes. The customer reviews and approves the digital proof before bulk production is arranged.

Related guides

Useful Next Steps

get a quote

Related custom patch information for buyers.

Ready to Coordinate Your Custom Patch Order?

Send your artwork, size, quantity, preferred patch type and shipping country. Heypal Patch will review the details and prepare a quotation based on confirmed requirements.

WhatsApp